Fynbos Ascent Hub

Venue 05 / 07 · Competitive Climbing

Fynbos Ascent Hub

Africa's first IFSC sustainable climb.

Area

1,436 m²

Capacity

150-200 climbers daily

Capital programme

R25-35M

Standard

IFSC accreditation target

The concept

Africa's first IFSC sustainable climb.

Three zones in one indoor hub: a 15m lead/speed wall with overhangs mimicking Table Mountain ridges, a 4.5m bouldering area for V0-V12, and a training zone with Kilter and Moonboard. IFSC-ready for African World Cup rounds.

Inspired by: Kletterzentrum Innsbruck · Tokyo 2020 · Boulder Exe Titan

Build & cost profile

What it takes to build.

Extracted from the independent six-node venue analysis (August 2026). Capital ranges are the published Project Motion figures; construction programme, capex intensity and pricing are independent estimates benchmarked internationally and adjusted for South African conditions.

R25M-R35M

Estimated construction cost

6-12 months (fit-out heavy)

Estimated construction time

~R20,900 / m²

Capex intensity (midpoint)

1,436 m²

Footprint

Key cost drivers

  • Wall systems and structural height
  • Holds, volumes and auto-belays
  • Impact flooring and matting
  • HVAC and ventilation load

Build type

Indoor competition walls

Indicative entry pricing

Indicative ~R150 per visit; high-value memberships

Role in the campus

Compact high-performance training node on the IFSC pathway.

Pre-acquisition - LOI in progressPre-acquisition and pre-rezoning estimates, not project quotes. Cape Town construction typically carries a premium, and contingency, professional fees and soft costs add roughly 15-30% to hard construction. Full node-level analysis, including consultants and returns, is released to approved parties in the Investor Data Room.

Safety & emergency response

How this node is kept safe.

Extracted from the Project Motion Safety, Medical, Emergency Response & Risk Management framework (August 2026). Quantities are preliminary recommendations pending validation against the final architectural plan, occupancy modelling and applicable South African standards.

On-node medical provision

1 first-aid box · 1 AED · 1 mobile trauma kit

Emergency priority

RED for a major fall; AMBER for suspected fracture

Principal risks

  • Falls
  • Incorrect harness use
  • Incorrect belay
  • Rope or anchor failure
  • Falling objects
  • Suspension injury

Operating controls

  • Harness, rope and anchor inspection with a double-check system
  • Belay competency sign-off before independent use
  • Fall-zone control and rescue route kept clear
  • Documented equipment inspection logs and retirement schedule
  • Rescue and suspension-trauma procedures rehearsed

Required staff competencies

First aid · CPR / AED · Climbing supervision · Harness, rope and anchor inspection · Belay competency · Rescue procedures

The full safety & medical framework →

Key features

What's built in.

  • 15m lead and speed wall with banked overhangs
  • 4.5m bouldering - slabs through 72° overhangs
  • Kilter / Moonboard / Tension training boards
  • Spectator seating for 500 with live-stream booths

Sustainability

How it's built green.

  • 80-90% recycled - ocean-plastic panels, fly-ash concrete
  • Reclaimed invasive-species timber accents
  • Solar roof and rainwater wall-cleaning system
  • Green walls and fynbos courtyard for thermal mass