Project Motion logoPROJECT MOTION

Sustainability framework

Built from what others throw away.

Project Motion is engineered around a simple thesis: the most sustainable Olympic-grade campus on the continent isn't a slogan - it's a procurement strategy, a water plan, and an energy budget. Here's how it works.

01

Recycled by default

Every venue targets 70-90% recycled material content - molded ocean plastic, tyre-rubber matting, fly-ash concrete, reclaimed invasive-species timber. Local sourcing first.

10-20 tons

of recovered ocean plastic per venue

02

Circular water

The adjacent Melkbosstrand WWTW supplies a closed loop for lagoon top-up, surface dust control and fynbos irrigation, with UV filtration to keep water safe for athletes.

R2-R8

per kilolitre recycled, vs R35-R45 potable

03

Cape sun, only

Rooftop solar arrays carry baseline lighting, EV charging and venue operations. Programmable wave tech and starting gates run on stored solar.

100%

renewable power target

04

Fynbos first

Indigenous fynbos, palms and aloes line every lagoon edge, ramp edge and viewing deck inside the enclosed envelope - restoring biodiversity, softening interior acoustics and holding humidity without irrigation.

0 m²

of non-native landscaping

Water economics

An action sports campus run on recycled municipal water.

A tertiary treatment upgrade at the Melkbosstrand WWTW - UV plus multimedia filtration - supplies the surf lagoon at R2-R8 per kilolitre against a potable rate of R35-R45. Over a 40-year lifecycle that arbitrage is worth R90M-R250M, and it makes the claim certifiable rather than aspirational.

Established internationally, and intended to be the first at this scale in South Africa.

R90M-R250M

40-year cost saving

UV + multimedia

Tertiary filtration upgrade

650-850 m

Pipeline run from the WWTW

Proven internationally

Surf parks already run on recycled water.

Feeding a large surf or recreational lagoon from treated, reclaimed water is established practice, not an untested idea. Several of the world's leading surf parks already do it.

  • Wavegarden facilitySpain

    Draws make-up water from the local municipal treatment plant's filtration system to offset evaporation losses from the lagoon - the same pipeline principle proposed here.

  • Adventure Parc SnowdoniaWales

    Fills its surf lagoon from recycled outflow water and disinfects with UV rather than chlorine.

  • URBNSURF MelbourneAustralia

    Runs on harvested and treated stormwater from an adjacent catchment system, cutting potable water use.

  • Surf Ranch, LemooreCalifornia, USA

    Operates a lagoon of roughly 15 million gallons on a filtration, UV and chlorine treatment train at full commercial scale.

The facilities below are public industry reference examples only. Project Motion has no agreement, partnership or relationship of any kind with any of them.

Safe for human use

Treated to a standard set for people to swim in.

  • A regulated category, not an experiment

    Tertiary-treated recycled water for recreational water bodies is a defined, permitted use. California's Title 22 recycled-water rules and the equivalent Australian guidelines both set standards for lake fill and landscape impoundments, and South African use would be licensed and monitored under Department of Water and Sanitation and City of Cape Town conditions.

  • Off-the-shelf treatment train

    Multimedia filtration, UV disinfection, residual dosing and continuous turbidity and microbiological monitoring are standard, proven equipment specified daily for public swimming water. Nothing in the proposed plant is unproven technology.

  • Full-contact water quality

    The lagoon is designed to meet full-contact recreational water standards - the same class of standard applied to public pools and swimming beaches - with automatic monitoring and shutdown thresholds set by the water engineer appointed at design stage.

  • What it means for a surfer

    By the time water reaches the lagoon it has been treated and disinfected to a standard set for people to swim, surf and be fully immersed in, and it is tested continuously while the venue is open.

Pre-acquisition - LOI in progressDesign intent only. No treatment plant is built, no water-use licence is issued and no engineer is appointed. Water quality, monitoring regime and shutdown thresholds will be set by the appointed engineer and confirmed by the regulator before any public use.

Grant-aligned by construction.

Designs and material specs are mapped to the eligibility criteria of funders Project Motion intends to approach - IDC, NLC, FIFA Forward, PIC, DBSA and SRSA - so capital could flow through multiple funding lines simultaneously. No funder has been approached and no grant is committed.