Aerial Motion Park

Africa's first competitive trampoline & aerial arena.

Area

3,200 m²

Capacity

150-250 athletes daily

Capital programme

R55-85M

Standard

FIG / Olympic trampoline standard

The concept

Africa's first competitive trampoline & aerial arena.

Africa's first fully-integrated competitive trampoline and aerial-sports arena - designed with the intention of collaborating with world-renowned trampoline coach Greg Roe, whose involvement is desired and not agreed. Six FIG-spec competition trampolines, a double-mini, a tumble track, foam pits and resi-mats support everything from Olympic-pathway athletes to first-time flippers, plus a dedicated aerial rig for skate, BMX and surf air training.

Inspired by: Reference facilities only: Greg Roe Trampoline (Ontario) · Woodward · House of Air · Tokyo 2020 trampoline

Build & cost profile

What it takes to build.

Extracted from the independent six-node venue analysis (August 2026). Capital ranges are the published Project Motion figures; construction programme, capex intensity and pricing are independent estimates benchmarked internationally and adjusted for South African conditions.

R55M-R85M

Estimated construction cost

9-18 months

Estimated construction time

~R21,900 / m²

Capex intensity (midpoint)

3,200 m²

Footprint

Key cost drivers

  • FIG-spec competition trampolines
  • Safety systems, pits and resi-matting
  • Aerial apparatus and rigging
  • Sprung flooring and tumble track
  • Spectator and media integration

Build type

Indoor arena

Indicative entry pricing

Indicative ~R140 per visit, with parties and camps as add-ons

Role in the campus

Year-round indoor aerial and trampoline pathway driving family and youth volume.

Pre-acquisition - LOI in progressPre-acquisition and pre-rezoning estimates, not project quotes. Cape Town construction typically carries a premium, and contingency, professional fees and soft costs add roughly 15-30% to hard construction. Full node-level analysis, including consultants and returns, is released to approved parties in the Investor Data Room.

Safety & emergency response

How this node is kept safe.

Extracted from the Project Motion Safety, Medical, Emergency Response & Risk Management framework (August 2026). Quantities are preliminary recommendations pending validation against the final architectural plan, occupancy modelling and applicable South African standards.

On-node medical provision

1 first-aid box · 1 AED · 1 mobile trauma kit

Emergency priority

RED for head, neck or spinal injury; AMBER for significant injury

Principal risks

  • Neck and spinal injury
  • Head injury
  • Fractures
  • Landing errors
  • Collision
  • Equipment failure

Operating controls

  • Padding and trampoline inspection before opening
  • Capacity control and skill-progression zoning
  • Trained spotters and landing-zone management
  • Emergency shutdown procedure
  • Head and neck injury response protocol

Required staff competencies

First aid · CPR / AED · Concussion recognition · Spotting · Equipment inspection · Emergency shutdown

The full safety & medical framework →

Key features

What's built in.

  • 6 × FIG-spec Olympic competition trampolines
  • Double-mini trampoline and 25m sprung tumble track
  • Foam pits, resi-mats and safety end-decks for progression
  • Aerial rig / bungee training zone for skate, BMX & surf crossover
  • Coaching bay and video-review room with slow-motion capture
  • Judged competition floor with FIG-standard lighting and spectator seating for 400

Sustainability

How it's built green.

  • Recycled-steel frames and locally fabricated rigging
  • Recycled-foam pit fill sourced from SA upholstery offcuts
  • Solar roof powering LED arena and charging stations
  • Low-VOC finishes and passive cross-ventilation